Sign Up for FREE Daily Energy News
canada flag CDN NEWS  |  us flag US NEWS  | TIMELY. FOCUSED. RELEVANT. FREE
  • Stay Connected
  • linkedin
  • twitter
  • facebook
  • instagram
  • youtube2
BREAKING NEWS:
Copper Tip Energy Services
Hazloc Heaters
Zachry Integrity Engineering
Zachry Integrity Engineering
Copper Tip Energy
Hazloc Heaters


Line 3 and Line 5 pipelines in U.S. ‘absolutely critical,’ says Enbridge CEO


These translations are done via Google Translate

CALGARY — The CEO of Enbridge Inc. says the company’s Line 3 and Line 5 pipelines in the United States are “absolutely critical” as each faces ongoing hurdles thrown up by environmental, political and other opponents.

During the Calgary-based energy infrastructure company’s annual general meeting on Wednesday, Al Monaco said Enbridge must continue to fight for those pipelines for its benefit as well as the benefit of the shippers who move products on them and the consumers who need those products.

Enbridge’s Line 5 is facing a looming May 12 shutdown ordered by Michigan Gov. Gretchen Whitmer last fall after accusing the company of violating terms of a 1953 deal that allowed the line to traverse the bottom of the Straits of Mackinac, which connects Lake Michigan and Lake Huron.


Get the Latest Canadian Focused Energy News Delivered to You! It's FREE: Quick Sign-Up Here


The 68-year-old conduit has never leaked and Enbridge has said it will ignore the order because the state doesn’t have the authority to shut down the pipeline.
 

 
Meanwhile, the $9.3-billion Line 3 pipeline replacement project is under construction with a completion target of late this year, despite ongoing protests and court challenges.

In response to an investor’s question of how much Enbridge spends to defend itself from legal challenges, Monaco said “a lot,” but added that such costs are part of the business now.

“The infrastructure assets we own as a company and the ones we’re developing and replacing, like this, and modernizing, I think are absolutely critical to the energy future no matter what the degree of change in the energy landscape is,” he said.

BBA Consultants
GLJ

“But I have to say, this is really part of the business today. We expect to have legal challenges and, frankly, it’s the management team’s job to manage those.”

This report by The Canadian Press was first published May 5, 2021.

Companies in this story: (TSX:ENB)

The Canadian Press



Share This:



More News Articles


GET ENERGYNOW’S DAILY EMAIL FOR FREE