Roska DBO’s temporary gas processing facility is back from a previous assignment and available for immediate rental. This facility is ideal for evaluating exploratory wells and can capture the information you need to understand your reservoir and plan the future of your development. Able to produce raw field gas into a spec pipeline, our facility can be brought online in as little as 10 weeks – with minimal capital investment.
EQUIPMENT PROVIDED
- Separation
- Compression
- Dehydration
- Meter Skid with Dew Point Analyzer
- Pressurized Condensate Storage
- Flare Knockout Drum
- Flare Stack
- Power Generation
- Instrument Air Package
Learn more by visiting: roskarentals.com/product-category/epf/field-gas-processing
Share This:
Canadians Should Decide What to do With Their Money – Not Politicians and Bureaucrats