Sign Up for FREE Daily Energy News
canada flag CDN NEWS  |  us flag US NEWS  | TIMELY. FOCUSED. RELEVANT. FREE
  • Stay Connected
  • linkedin
  • twitter
  • facebook
  • instagram
  • youtube2
BREAKING NEWS:
Zachry Integrity Engineering
Copper Tip Energy Services
Hazloc Heaters
Zachry Integrity Engineering
Copper Tip Energy
Hazloc Heaters


Fort Hills oilsands project achieves first oil, now in continuous production


These translations are done via Google Translate

CALGARY — The Fort Hills oilsands project has achieved its first oil production and will continue to ramp up through the first quarter.

Suncor Energy Inc., the project operator, says Fort Hills remains on track to reach 90 per cent capacity by the end of 2018.

The Fort Hills operation is 90 kilometres north of Fort McMurray, Alta., and has a capacity of approximately 194,000 barrels per day.

Suncor holds a 53.06 per cent interest in the project, while Total E&P Canada Ltd. owns 26.05 per cent. Teck Resources Ltd. holds the remaining 20.89 per cent.

 

 

Companies in this story: (TSX:SU, TSX:TECK.B)

The Canadian Press



Share This:



More News Articles


GET ENERGYNOW’S DAILY EMAIL FOR FREE