Sign Up for FREE Daily Energy News
canada flag CDN NEWS  |  us flag US NEWS  | TIMELY. FOCUSED. RELEVANT. FREE
  • Stay Connected
  • linkedin
  • twitter
  • facebook
  • instagram
  • youtube2
BREAKING NEWS:
Hazloc Heaters
Zachry Integrity Engineering
Copper Tip Energy Services
Hazloc Heaters
Copper Tip Energy
Zachry Integrity Engineering


Equinor Hires Companies for Preliminary Work on Stalled Bay du Nord Oilfield Off Newfoundland


These translations are done via Google Translate

ST. JOHN’S, N.L. — Norwegian energy giant Equinor has contracted two companies to do preliminary work for the stalled Bay du Nord offshore oil project in Newfoundland and Labrador.

BW Offshore, an international company headquartered in Norway, says Equinor hired it to do a preliminary design study for a production and storage vessel that could operate in the Bay du Nord oilfield off the coast of St. John’s.


Get the Latest Canadian Focused Energy News Delivered to You! It's FREE: Quick Sign-Up Here


The company says in a news release that the work will support Equinor’s “strategic goals” for the Bay du Nord project.

Altera Infrastructure, headquartered in the United Kingdom, also says it has been tapped for a preliminary design contract related to a production and storage vessel.

The Canadian government approved the Bay du Nord development in 2022, though Equinor announced in 2023 that it was putting the $16-billion project on hold for up to three years as it figured out how to make it more cost effective.

GESC - Global Energy Show Canada 2026
BBA Consultants
GLJ

The company has not made a final decision on whether or not it will go ahead.

The Bay du Nord oilfield is roughly 500 kilometres off the coast of St. John’s, in waters about 1,170 metres deep, and it would be the first deep-water oil project in Newfoundland and Labrador’s offshore region.

This report by The Canadian Press was first published January 25, 2025.

The Canadian Press



Share This:



More News Articles


GET ENERGYNOW’S DAILY EMAIL FOR FREE