Raise will be presenting their patented and patent pending 3-Stage solutions to unconventional challenges in artificial lift for horizontal wellbores:
- Stage 1: Efficiently pumping from the build and horizontal sections of any wellbore using the HARPTM technology
- Stage 2: Returning the reservoir to equilibrium from a preferentially heel depleted condition utilizing REALTM horizontal separation
- Stage 3: Reaching for the toe with the HARTTM system to create multiple points of drawdown along the horizontal lateral and access stranded reserves
For additional information about Raise Production, visit www.raiseproduction.com or contact:
Eric Laing, President & CEO
elaing@raiseproduction.com
403-899-5880
Share This:
COMMENTARY: Workers Must Be Part of the Energy Transition – Resource Works