Sign Up for FREE Daily Energy News
canada flag CDN NEWS  |  us flag US NEWS  | TIMELY. FOCUSED. RELEVANT. FREE
  • Stay Connected
  • linkedin
  • twitter
  • facebook
  • instagram
  • youtube2
BREAKING NEWS:
Zachry Integrity Engineering
Hazloc Heaters
Copper Tip Energy Services
Zachry Integrity Engineering
Copper Tip Energy
Hazloc Heaters


TC Energy Cuts Cost Estimate for Southeast Gateway Pipeline Project in Mexico


These translations are done via Google Translate

CALGARY — TC Energy Corp. has lowered the estimated cost of its Southeast Gateway pipeline project in Mexico.

It says it now expects the project to cost between US$3.9 billion and US$4.1 billion compared with its original estimate of US$4.5 billion.


Get the Latest Canadian Focused Energy News Delivered to You! It's FREE: Quick Sign-Up Here


The change came as the company reported a third-quarter profit attributable to common shareholders of C$1.46 billion or $1.40 per share compared with a loss of C$197 million or 19 cents per share in the same quarter last year.

Revenue for the quarter ended Sept. 30 totalled C$4.08 billion, up from C$3.94 billion in the third quarter of 2023.

TC Energy says its comparable earnings for its latest quarter amounted to C$1.03 per share compared with C$1.00 per share a year earlier.

BBA Consultants
GLJ

The average analyst estimate had been for a profit of 95 cents per share, according to LSEG Data & Analytics.

This report by The Canadian Press was first published Nov. 7, 2024.

Companies in this story: (TSX:TRP)

The Canadian Press



Share This:




More News Articles


GET ENERGYNOW’S DAILY EMAIL FOR FREE