Sign Up for FREE Daily Energy News
canada flag CDN NEWS  |  us flag US NEWS  | TIMELY. FOCUSED. RELEVANT. FREE
  • Stay Connected
  • linkedin
  • twitter
  • facebook
  • instagram
  • youtube2
BREAKING NEWS:
Hazloc Heaters
Hazloc Heaters


Line 3 protesters rally at Enbridge’s Bemidji office


These translations are done via Google Translate

BEMIDJI, Minn. — Dozens of people rallied outside the Minnesota office of Enbridge Energy to protest the company’s proposed Line 3 oil pipeline replacement.

Protesters say six members of their group chained themselves to a gate early Monday. Enbridge’s Bemidji office closed for the day.

Enbridge spokeswoman Juli Kellner says a vehicle drove through a locked gate at a pipe storage yard in Hubbard County over the weekend. It’s unknown if that’s related to the protest.

The $2.6 billion replacement pipeline would carry Canadian crude from Alberta across northern Minnesota to Enbridge’s terminal in Superior, Wisconsin. Enbridge says the current Line 3, which was built in the 1960s, is subject to corrosion and cracking.

Surepoint Group

Environmental and tribal groups say the project risks oil spills in pristine areas of the Mississippi River headwaters region.

The Associated Press

Share This:




More News Articles


GET ENERGYNOW’S DAILY EMAIL FOR FREE