Sign Up for FREE Daily Energy News
canada flag CDN NEWS  |  us flag US NEWS  | TIMELY. FOCUSED. RELEVANT. FREE
  • Stay Connected
  • linkedin
  • twitter
  • facebook
  • instagram
  • youtube2
BREAKING NEWS:
Copper Tip Energy Services
WEC - Western Engineered Containment


Inter Pipeline Announces New Conventional Oil Pipeline Project


These translations are done via Google Translate

 

 

CALGARYAug. 7, 2019 /CNW/ – Inter Pipeline Ltd. (“Inter Pipeline”) (TSX: IPL) announced today that it has received commercial support for the construction of a $100 million pipeline connection between its Bow River and Central Alberta pipeline systems. The new pipeline, called the Viking Connector, will link various grades of light crude oil from the Viking and Mannville formations in east-central Alberta to the Edmonton market hub.

“The Viking Connector enables us to cost effectively leverage our extensive regional pipeline network and provide customers with superior market access,” said Christian Bayle, President and Chief Executive Officer of Inter Pipeline. “Producers in the Alberta Viking and surrounding plays are currently limited to pipeline services to the Hardisty hub or costly trucking alternatives. This connection will provide economical access to the Edmonton market hub which historically has been a premium market for Alberta light oil products, a clear benefit for producers.”

This $100 million investment is the second phase of a multi-phased development program for the Central Alberta pipeline system. This phase includes the construction of 75 kilometers of eight-inch diameter pipeline that will connect Inter Pipeline’s Throne Station on the Bow River pipeline system to the Central Albertapipeline system in the Stettler area. In addition, Inter Pipeline will complete upgrades to the Throne Station, which includes reconfiguring existing tank storage and expanding truck offloading capacity. Construction will begin immediately and is expected to be completed in the first half of 2020.

Surepoint Group

When completed, Inter Pipeline forecasts throughput volume of 10,000 to 15,000 barrels per day (b/d) on the Viking Connector, with approximately one third of forecast shipments currently secured for a 10-year term. Additional term transportation agreements are under negotiation and contracted commitment levels may rise by the in-service date.

Phase one of the Central Alberta development program, which commenced in late 2017, includes the conversion of the pipeline system to multi-product batch operation, and construction of additional truck offloading and tank storage capacity at the Stettler Station. Batch operations began in mid-2018 and an additional 10,000 b/d of truck unloading capacity is expected to enter service in the fall of 2019. Two new 130,000 barrels storage tanks, the final component of phase one, are expected to be complete by the spring of 2020. Further phases may be required over the next several years to support additional production growth.

A map of the new connector pipeline is available on our website at www.interpipeline.com.

About Inter Pipeline Ltd.

Inter Pipeline is a major petroleum transportation, natural gas liquids processing, and bulk liquid storage business based in Calgary, Alberta, Canada. Inter Pipeline owns and operates energy infrastructure assets in western Canada and Europe. Inter Pipeline is a member of the S&P/TSX 60 Index and its common shares trade on the Toronto Stock Exchange under the symbol IPL.  www.interpipeline.com



Share This:



More News Articles


GET ENERGYNOW’S DAILY EMAIL FOR FREE