Copper Tip Energy
MNP LLP Oilfield Services
Copper Tip Energy Services
MNP LLP Oilfield Services

Pipeline beneath Straits of Mackinac passes pressure tests

Posted On June 12th
By : The Canadian Press
Comment: Off

MACKINAW CITY, Mich. — Pipeline company Enbridge says an oil pipeline beneath the Straits of Mackinac in northern Michigan has passed federally required pressure tests.

The test took place Saturday on one pipeline that's part of Line 5.

Enbridge pumped the line's west segment with water and kept pressure high for 8 hours. Enbridge officials told reporters in a conference call Monday the line is fit for service and no leaks were found.

A second pipeline, called the east segment, will be tested soon.

The pipelines were built in 1953. Line 5 carries about 23 million gallons (19 million imperial gallons) of crude oil and liquid natural gas daily between Superior, Wisconsin, and Sarnia, Ontario. A nearly 5 mile (8 kilometre) section, divided into two lines, runs along the bottom of the straits area where Lakes Huron and Michigan converge.

The Associated Press

About the Author
Share This Article By Email

Related Posts

New SHOWCASE Directory Companies

Assetworks
Environmental Refueling Systems (ERS)

Predator Drilling
Galdos Systems

 

FUELware
Versa-Line

Galloway Construction Group
Techmation Electric & Controls